In Graph variables, enter multiple columns of numeric or date/time data that you want to graph.
This worksheet contains the diameters of pipes that were produced each week for three weeks. Week 1, Week 2, and Week 3 are the graph variables. The graph shows the diameters of the pipes produced each week.
| C1 | C2 | C3 | 
|---|---|---|
| Week 1 | Week 2 | Week 3 | 
| 5.19 | 5.57 | 8.73 | 
| 5.53 | 5.11 | 5.01 | 
| 4.78 | 5.76 | 7.59 | 
| ... | ... | ... | 