This gives very precise control of which Resources will work on individual Work Items.
If you have a process where a Resource has worked on a particular Work Item and that same Resource is then required to work on that same Work Item later on in the process.
Below is a representation of an Inspection process. There are two Inspectors who decide whether items coming off the production line need rework. If the items need rework it is then required to be reinspected by the same Inspector to ensure that the fault that individual found have been fixed.


You will be prompted to select a Label, you do not need to do anything with the Label, but Simul8 uses this Label to store information on which Resource was used.
You will be prompted again to select a Label; you
must select the Label you selected in Step 4.