Each set of calculations can use a maximum of 10K observations. If you have more than 10K observations in a single batch, the calculations will be performed on partial batches.
To link a Connect data table to a sampling plan, you must have a data table that contains data from at least one measure, date/time information, and subgroup information, if applicable. For more information on creating a data table in Minitab Connect, go to Create a Minitab Connect® data table for automatic data collection.
If timestamps are different within the same subgroup, Real-Time SPC uses the first valid timestamp for the entire subgroup.
If you need to change the data table or data view, date column, or subgroup column, select Set Data Source.
Calculated measures are not available with automatic data collection and data streaming.