Example of Accelerated Life Test Plan

An engineer tests capacitors at accelerated temperatures of 85, 105, and 125 degrees to determine the 1000-hour reliability under normal-use conditions of 45 degrees. 100 capacitors are available to test. The engineer uses the following information for the test plans.
  • Failure times tend to follow an exponential distribution.
  • The Arrhenius relationship with an intercept of -8.0 and slope of 0.5 appropriately models the relationship between log failure time and temperature.
  1. Choose Stat > Reliability/Survival > Test Plans > Accelerated Life Testing.
  2. Under Parameter to be Estimated, select Reliability at time, and enter 1000.
  3. From Sample sizes or precisions as distances from bound of CI to estimate, select Sample size and enter 100.
  4. From Distribution, select Exponential. From Relationship, select Arrhenius.
  5. Under Specify planning values for two of the following, in Intercept, enter -8. In Slope, enter 0.5.
  6. Click Stresses.
  7. In Design stress, enter 45. In Test stresses, enter 85 105 125.
  8. Click OK in each dialog box.

Interpret the results

Minitab evaluates the resulting test plans and displays the best plans with respect to minimizing the precision or the sample size. If the sample size is specified, the 1st Best "Optimum" Allocations Test Plan is the plan with the smallest standard error of the parameter of interest.

To estimate the 1000-hour reliability at the design stress of 45 degrees using the optimal plan, the engineer should test the following number of units at each accelerated temperature:
  • Test 63 units at 85 degrees
  • Test 4 units at 105 degrees
  • Test 33 units at 125 degrees

The settings for this test plan have no censoring for any of the stress levels, so the plan is that the test continues until 100% of the units fail.

Because the standard error for all three plans is very close, the engineer should also consider additional criteria when choosing an allocations plan, such as which plan yields more failures or is the least expensive to execute.

Planning Distribution

DistributionInterceptSlope
Exponential-80.5 
Uncensored data
Arrhenius model
Estimated parameter: Reliability at time = 1000
Calculated planning estimate = 0.964857
Design stress value = 45
Selected test plans:  “Optimum” allocations test plans
Total available sample units = 100

1st Best “Optimum” Allocations Test Plan

Test StressPercent
Failure
Percent
Alloc
Sample UnitsExpected
Failures
85  10063.33336363
105  1003.958344
125  10032.70833333
Standard error of the parameter of interest = 0.0123437

2nd Best “Optimum” Allocations Test Plan

Test StressPercent
Failure
Percent
Alloc
Sample UnitsExpected
Failures
85  10068.33336868
105  1003.958344
125  10027.70832828
Standard error of the parameter of interest = 0.0124673

3rd Best “Optimum” Allocations Test Plan

Test StressPercent
Failure
Percent
Alloc
Sample UnitsExpected
Failures
85  10058.33335858
105  1008.958399
125  10032.70833333