A quality engineer wants to determine whether a steel bar cutting process is in control. The engineer measures the length of five steel bars for ten shifts.
The engineer creates a zone chart to monitor the length of steel bars.
For the steel bar length data, subgroup 5 has a cumulative score of 8, and subgroup 10 has a cumulative score of 8. The manufacturing process is out of control.