A quality engineer from a plastic manufacturing company would like to make sure his batch process stays in control. The engineer measures the concentration of pigment of each batch for all 35 batches.
Batch 28 is above the upper control limit. The engineer should investigate why the concentration of pigment for this batch is more than what is expected.