All statistics and graphs for Acceptance Xbar-R Chart

Find definitions and interpretation guidance for every statistic and graph that is provided with the Acceptance Xbar-R chart.

Plotted points

The plotted points on an Acceptance Xbar chart represent the averages of the measurements within each subgroup. Red points indicate subgroup means that fail Test 1 because they are outside an acceptance control limit. A point outside an acceptance control limit indicates that the process mean shifted far enough toward the corresponding specification limit that the accepted percentage of process output outside the specification limit might be exceeded.

The plotted points on the R chart represent the subgroup ranges. Red points indicate subgroups that fail at least one of Tests 1 through 4. Investigate these points for possible special-cause variation.

Center line

The center line for the Acceptance Xbar chart represents the average of the plotted points (also called the process mean). The subgroup means do not need to remain randomly distributed around the center line.

The center line for the R chart represents the process variation. If the subgroup size is constant, then the center line on the R chart is the average of the subgroup ranges. If the subgroup sizes differ, then the value of the center line depends on the subgroup size, because larger subgroups tend to have larger ranges. Use the center line to compare each subgroup range to the typical within-subgroup variation. If the process variation is in control, then the points vary randomly around the center line.

CAUTION

Do not confuse the center line with the target value for your process. The target is your desired outcome. The center line is the actual outcome.

Control limits

The acceptance control limits on the Acceptance Xbar chart indicate when the process mean shifts far enough toward a specification limit that the accepted percentage of process output outside the specification limit might be exceeded. The limits are based on the specification limits, the accepted percentage outside each specification limit, the probability of intervention, the subgroup size, and the estimated within-subgroup variation.

The Acceptance Xbar chart displays a lower acceptance control limit, an upper acceptance control limit, or both, depending on which specification limits you enter. The acceptance control limits are not necessarily the same distance from the center line.

The control limits on the R chart show the amount of variation that is expected in the subgroup ranges. If the process variation is in control, then the points vary randomly within the control limits.

CAUTION

Do not confuse acceptance control limits with specification limits. Specification limits define the acceptable values for individual process output. Acceptance control limits apply to subgroup means and indicate when to investigate a shift in the process mean.

Tests for special causes

Acceptance Xbar chart

Only Test 1 applies to the Acceptance Xbar chart. Test 1 identifies subgroup means that are outside the acceptance control limits. These points indicate that the process mean shifted far enough toward the corresponding specification limit that the accepted percentage of process output outside the specification limit might be exceeded.

R chart

Tests 1 through 4 apply to the R chart. Use these tests to identify specific patterns in the subgroup ranges that might indicate special-cause variation.

Test 1: One point more than 3σ from the center line
Test 1 identifies subgroups that are unusual compared to other subgroups. If small shifts in process variation are of interest, you can use Test 2 to supplement Test 1 to increase the sensitivity of the chart.
Test 2: Nine points in a row on the same side of the center line
Test 2 identifies shifts in the process variation.
Test 3: Six points in a row, all increasing or all decreasing
Test 3 detects trends. This test looks for a long series of consecutive points that consistently increase or decrease.
Test 4: Fourteen points in a row, alternating up and down
Test 4 detects systematic variation. A point that fails Test 4 might indicate that the pattern of variation is predictable.
Note

When you use several tests on the R chart at the same time, the sensitivity of the chart increases. However, the false alarm rate also increases, which can make you react to the test results unnecessarily.

Standard deviation

The standard deviation represents the variation among measurements within subgroups. It does not include variation caused by shifts in the process mean between subgroups. Smaller values indicate that the measurements within each subgroup are more consistent.

Minitab uses the standard deviation, together with the specification limits, the accepted percentage outside each specification limit, the probability of intervention, and the subgroup size, to calculate the acceptance control limits on the Acceptance Xbar chart. Minitab does not display the standard deviation on the chart.

To store the standard deviation in the worksheet, select it on the Storage tab of the Options dialog box.

Stages

Use stages to create a historical control chart that shows how a process changes over specific periods of time. By default, Minitab recalculates the center line and control limits for each stage. For more information, go to Add stages to show how a process changed.

Interpretation

This historical control chart shows three stages of a process, which represent before, during, and after the implementation of a new procedure.