If your data are in a single column of the worksheet, complete the following steps.
Observations within each subgroup should be in adjacent rows of the worksheet. For more information on using columns to define subgroups, go to Using subgroups to assess process capability.
C1 | C2 |
---|---|
Diameter | Subgroup ID |
74.030 | 1 |
74.002 | 1 |
74.019 | 1 |
73.992 | 1 |
73.995 | 2 |
73.992 | 2 |
If you have subgroups arranged in rows across several columns of the worksheet, and each row represents a single subgroup, complete the following steps.
If you use this option to enter your data, all subgroups must be the same size. If your subgroups are arranged in rows and the sizes differ, you can enter a missing value symbol "*" in worksheet cells as needed to make all the subgroup sizes the same.
C1 | C2 | C3 |
---|---|---|
Observation 1 | Observation 2 | Observation 3 |
74.030 | 73.995 | 73.988 |
74.002 | 73.992 | 74.024 |
74.019 | 74.011 | 74.021 |
73.992 | 74.004 | 74.005 |
From the drop-down list, select a nonnormal distribution to fit your data. To produce a reliable estimate of process capability, the data must follow the distribution that you select. If you are unsure which distribution best fits your data, use Individual Distribution Identification.
For more information on choosing an appropriate distribution for nonnormal data, go to Capability analyses with nonnormal data.
To perform the analysis, you must enter a lower specification limit, an upper specification limit, or both.