Time Series Plot for Perform Type 1 Gage Study

Use Time Series Plot to visualize stability study results. With a time series plot, you can see patterns in the measurements over time.

This example applies to the Measurement System Analysis Module. For more information, go to www.minitab.com/measurement-system-analysis-module.

Example

In this worksheet, Measurement contains the measurements of the same part by the same operator, in time order.

C1
Measurement
1.15
1.23
1.31
1.35
1.16
1.24
1.28

How-to

  1. Choose Solutions Modules > Capabilities > Measurement System Analysis, then select Launch.
  2. Under Stability Study, select Select a Stability Study.
  3. Select Perform type 1 gage study, then click OK.
  4. Select Time Series Plot, then click OK.
  5. In Series (desktop app) or Y-variable (web app), enter the column that contains the measurement data.
  6. Click OK.
Tip

For more information about this analysis, click Help in the main dialog box.