This example applies to the Healthcare Module. For more information, go to www.minitab.com/healthcare-module.

Example

In this worksheet, Bed Turnaround Time, Notification Time, and Hour of Day are the graph variables.

C1 C2 C3
Bed Turnaround Time Notification Time Hour of Day
46 10 18
47 19 20
66 28 3
49 25 20

How-to

  1. From the Healthcare KPIs: Visualize Relationships with Bed Turnaround Time dialog box, select Matrix Plot, then click OK.
  2. In Graph variables (desktop app) or Variables (web app), enter the bed turnaround time column and up to 19 additional columns of numeric or date/time data with the same number of rows.
  3. Click OK. Minitab creates a plot for each combination of variables.
Tip

For more information about this analysis, click Help in the main dialog box.