A quality engineer at a company that makes plastic pipes is concerned about the consistency of the pipe diameters. The engineer measures 10 pipes a week for three weeks from each of two machines.
As part of the initial investigation, the engineer creates an individual value plot to compare the diameters of the pipes measured each week.
The spread of the distribution of diameters appears to increase each successive week.