Label Based Resources allow the Resource that is required at an Activity to be determined according to a Label Value.

The chosen Label's value must then be positive integers from 1 (i.e. a Label with value '2' will cause the work to require the second Resource in the 'Resources Required' list above)
To see this feature in action, download this Resource_by_label.S8.