A quality engineer wants to determine whether a steel bar cutting process is in control. The engineer measures the length of five steel bars for ten shifts.
You can use this data to demonstrate Zone Chart.
Worksheet column | Description |
---|---|
Subgroup ID | The subgroup identifier |
Length | The length of the steel bar |