A quality engineer wants to determine whether a steel bar cutting process is in control. The engineer measures the length of five steel bars for ten shifts.
You can use this data to demonstrate Zone Chart.
| Worksheet column | Description |
|---|---|
| Subgroup ID | The subgroup identifier |
| Length | The length of the steel bar |