A quality engineer monitors the manufacture of liquid detergent and wants to assess whether the process is in control. The engineer measures the pH of 25 consecutive batches of detergent.
Because the data are not collected in subgroups, you can use this data to demonstrate I-MR Chart.
Worksheet column | Description |
---|---|
Batch ID | The batch identifier |
pH | The pH of each batch |