Standard Work Combination Chart

Use the Standard Work Combination Chart form to show the manual, machine, and walking time associated with each work element. The output graphically displays the cumulative time as manual (operator controlled) time, machine time, and walk time. Looking at the combined data helps to identify the waste of excess motion and the waste of waiting.

Guidelines

Use to break down the steps of a single operation or to analyze sequential operations.

How-to

Important

Before you conduct a time study, make sure that the process is running normally.

  1. Complete the header.
  2. Choose the takt time units.
  3. Enter the individual time values for each work element by category.
The form can display a set of work elements with a total cycle time of up to 120 time units, but can be modified for longer time periods.

For more information, go to Insert and fill out a form.